KBHM Collaborates with Solikamsk Magnesium Plant OJSC
Engineers and specialists from the Chemical Machine-Building Design Bureau (KBHM) presented proprietary technologies and engineering solutions for the extraction and processing of uranium, titanium, and rare earth elements to representatives of Solikamsk Magnesium Plant OJSC (SMZ OJSC).
The discussion focused on evaluating the practical application of these advanced technologies and approaches to upgrade existing processing stages and optimize production workflows across SMZ facilities.
AI image
Construction of the Administrative Office Building
Construction of the Administrative Office Building onstruction is currently underway on a modern administrative building designed to host corporate offices and provide a productive work
JSC “ZKMK” and Baker Hughes Sign Service Agreement to Localize Turbine and Compressor Maintenance
JSC “ZKMK” and Baker Hughes Sign Service Agreement to Localize Turbine and Compressor Maintenance JSC “West Kazakhstan Machine-Building Company” (ZKMK) and Baker Hughes have signed
KBHM to Participate in International Scientific and Practical Conference on Technological Metals
KBHM to Participate in International Scientific and Practical Conference on Technological Metals The Chemical Machine-Building Design Bureau (KBHM) is set to participate in the International
KBHM Collaborates with ERG on In-Situ Recovery Technologies for Bauxite
KBHM Collaborates with ERG on In-Situ Recovery Technologies for Bauxite As part of its strategic partnership with Eurasian Resources Group (ERG), the Chemical Machine-Building Design
LLP “IC “Hydromash-Orion” Participates in Kazakh-Estonian Business Cooperation
LLP “IC “Hydromash-Orion” Participates in Kazakh-Estonian Business Cooperation LLP “Investment Company “Hydromash-Orion” took part in the 7th meeting of the Kazakh-Estonian Intergovernmental Commission on Economic,
Evaluation Underway for GTPS Capacity Expansion (Installation of a 4th 18 MW Generating Unit)
Evaluation Underway for GTPS Capacity Expansion (Installation of a 4th 18 MW Generating Unit) As part of the energy infrastructure expansion initiative, feasibility studies are